Finishing the Roof


Raising a hexagon panel

The hexagon panels continued to be raised inside.


Lifting skylight panels

Lifting the two skylight panels was a challenge, as not only were they the highest, but also the heaviest.


Driving the last panel

Finally the last pentagon panel was driven into place, from the outside, locking the dome rigidly together.

 

Return to first construction page.
Go to next construction page - Finishing the dome shell.
Return to TRI-LEA-EM