The tractor-trailer that the dome kit was packed in is visible in the centre of this picture, parked at the back of the TRI-LEA-EM property.
The 55-foot trailer was filled from end to end with panels and insulation. Larry Grice, our neighbour, helped unload the trailer with his forklift tractor.
Here are some of the triangular panels the dome was constructed from, stacked up next to the foundation. The first panel is being carried on to the slab in this picture.